Davey Textile Solutions
BDC showed me that small improvements can translate into meaningful savings and capacity increases. By saving one hour on one of our machines, we unlocked the potential to add approximately $500,000 in annual gross margin to our business.
Dan King
Vice President, Production, R&D, Davey Textile Solutions
Davey Textile Solutions manufactures high-performance reflective materials for personal protective equipment (PPE) used by first responders and workers in forestry, oil and gas, and roadside safety environments.
About the company
Founded in 1986, the company manufactures 20 million metres of high-visibility reflective material a year in its Edmonton facility, selling it in markets across North, Central and South America.
Location: Edmonton,
Entrepreneur challenge
In a textile industry facing significant cost pressures and international competition, Davey Textile Solutions has been experienced significant growth as a result of robust efficiency process improvements combined with a relentless focus on automation and innovation. The company was on a solid growth trajectory but looking for new ways to improve operational scalability and production efficiency.
BDC expertise
BDC’s operational efficiency experts helped the company identify top sources of inefficiency and waste while uncovering opportunities for immediate improvements. Working closely with Davey’s employees, the BDC team evaluated operational processes and assessed existing operations management practices. Then, they developed a clear roadmap to address key operational challenges. Following their detailed review, BDC experts identified the cleaning routine of the equipment used in a key manufacturing stage as a major operational bottleneck. By streamlining the cleaning process, the company recovered nearly one hour of capacity per day on the equipment, creating the potential to add approximately $500,000 in annual gross profit.
Results
- Potential to add $500,000 in annual gross profit by streamlining the cleaning process of one key piece of equipment.
- Increased manufacturing capacity from 2 million metres of material a month to 3.5 million metres a month, positioning the company for its next phase of international growth.
- Reduced defects, improving overall material quality and reworks.
- Reduced the quantity of work-in-process inventory.